5.
Gently
push
the
latch
lock
2
)
away
from
the
rail
as
you
move
the
latch
lever
1
towards
the
far
end
of
the
rail.
The
latch-lock
carrier
assembly
slides
against
the
spring
tension.
6.
Continue
to
slide
the
latch-lock
carrier
for
approximately
13
mm
(0.5
in).
The
latch
lever
engages
a
hole
in
the
back
bracket
assembly,
and
holds
the
latch-lock
carrier
in
the
retracted
position.
7.
Push
the
back
rail
bracket
1
toward
the
front
of
the
rail
until
it
stops.
The
rail
is
now
at
its
shortest
adjustment.
1
2
Figure
27.
Retracting
the
latch
lock
carrier
1
2
1
2
Front
Figure
28.
Opening
the
front
latch-lock
carrier
assembly
Chapter
4.
Installing
the
uninterruptible
power
supply,
the
master
console,
and
the
SAN
Volume
Controller
27
Summary of Contents for TotalStorage
Page 1: ...IBM TotalStorage SAN Volume Controller Installation Guide V ersion 1 2 0 SC26 7541 02...
Page 2: ......
Page 3: ...IBM TotalStorage SAN Volume Controller Installation Guide V ersion 1 2 0 SC26 7541 02...
Page 22: ...xx Installation Guide...
Page 36: ...14 Installation Guide...
Page 58: ...36 Installation Guide...
Page 74: ...52 Installation Guide...
Page 80: ...58 Installation Guide...
Page 84: ...62 Installation Guide...
Page 89: ......
Page 90: ...Part Number 64P8120 Printed in USA SC26 7541 02 1P P N 64P8120...
Page 91: ...Spine information IBM TotalStorage SAN Volume Controller Installation Guide Version 1 2 0...