2.
If
you
are
installing
uninterruptible
power
supplies,
read
through
the
safety
and
environmental
notices.
Note:
If
you
are
installing
the
SAN
Volume
Controller
into
a
rack
that
already
contains
other
SAN
Volume
Controller
and
uninterruptible
power
supplies,
the
installed
uninterruptible
power
supplies
might
have
spare
capacity.
If
the
customer
intends
to
use
that
spare
capacity,
the
SAN
Volume
Controller
that
you
are
going
to
install
might
have
been
delivered
without
uninterruptible
power
supplies.
Related
topics:
v
v
v
Installing
the
support
rails
for
the
uninterruptible
power
supply
Before
you
can
install
the
uninterruptible
power
supply,
you
must
install
the
support
rails
into
the
rack.
Note:
If
you
are
installing
the
SAN
Volume
Controller
into
a
rack
that
already
contains
other
SAN
Volume
Controllers
and
uninterruptible
power
supply,
the
installed
uninterruptible
power
supply
might
have
spare
capacity.
If
the
customer
intends
to
use
that
spare
capacity,
the
SAN
Volume
Controllers
that
you
are
going
to
install
might
have
been
delivered
without
uninterruptible
power
supply.
Steps:
Perform
the
following
steps
to
install
the
support
rails
for
the
uninterruptible
power
supply:
1
2
(X2)
3
UPS
RAIL
KIT
P/N
21P7220
4
3
(X2)
5
Figure
18.
Items
for
installation
into
a
rack
16
Installation
Guide
Summary of Contents for TotalStorage
Page 1: ...IBM TotalStorage SAN Volume Controller Installation Guide V ersion 1 2 0 SC26 7541 02...
Page 2: ......
Page 3: ...IBM TotalStorage SAN Volume Controller Installation Guide V ersion 1 2 0 SC26 7541 02...
Page 22: ...xx Installation Guide...
Page 36: ...14 Installation Guide...
Page 58: ...36 Installation Guide...
Page 74: ...52 Installation Guide...
Page 80: ...58 Installation Guide...
Page 84: ...62 Installation Guide...
Page 89: ......
Page 90: ...Part Number 64P8120 Printed in USA SC26 7541 02 1P P N 64P8120...
Page 91: ...Spine information IBM TotalStorage SAN Volume Controller Installation Guide Version 1 2 0...