Note:
When
input
power
is
restored
to
the
uninterruptible
power
supply,
the
SAN
Volume
Controller
is
turned
on
without
the
front
panel
power
button
being
pressed.
Powering
off
shows
that
the
power
button
has
been
pressed
and
the
node
is
powering
off.
The
progress
bar
moves
backward
when
the
power
is
removed.
The
power-off
operation
might
take
several
minutes.
Restarting
shows
that
the
software
on
a
node
is
restarting.
The
software
is
restarting
either
because:
v
An
internal
error
was
detected
v
A
power-off
operation
was
ended
when
the
power
button
was
pressed
again
while
the
node
was
powering
off
If
a
power-off
operation
was
ended,
the
progress
bar
continues
to
move
backward
until
the
node
finishes
saving
its
data.
After
the
data
is
saved,
the
progress
bar
moves
forward
during
the
restart
operation.
Shutting
down
is
an
example
of
what
the
front
panel
indicator
shows
when
you
issue
a
shutdown
command
to
a
SAN
Volume
Controller
cluster
or
a
SAN
Volume
Controller
node.
The
progress
bar
continues
to
move
left
until
it
is
safe
to
be
powered
off.
When
the
shutdown
operation
is
complete,
all
power
will
be
removed
from
the
node.
When
power
has
been
removed
from
the
last
node
connected
to
the
uninterruptible
power
supply,
the
uninterruptible
power
supply
also
will
be
shut
down.
P o w e r F a i l u r e
Figure
42.
Power
failure
display
P o w e r i n g O f f
Figure
43.
Powering-off
display
R e s t a r t i n g
Figure
44.
Restarting
display
Chapter
5.
Using
the
front
panel
display
on
the
SAN
Volume
Controller
39
|
|
|
|
|
|
|
Summary of Contents for TotalStorage
Page 1: ...IBM TotalStorage SAN Volume Controller Installation Guide V ersion 1 2 0 SC26 7541 02...
Page 2: ......
Page 3: ...IBM TotalStorage SAN Volume Controller Installation Guide V ersion 1 2 0 SC26 7541 02...
Page 22: ...xx Installation Guide...
Page 36: ...14 Installation Guide...
Page 58: ...36 Installation Guide...
Page 74: ...52 Installation Guide...
Page 80: ...58 Installation Guide...
Page 84: ...62 Installation Guide...
Page 89: ......
Page 90: ...Part Number 64P8120 Printed in USA SC26 7541 02 1P P N 64P8120...
Page 91: ...Spine information IBM TotalStorage SAN Volume Controller Installation Guide Version 1 2 0...