OPTION 3 SETUP CONSIDERATIONS
Y-SPLITTER
REQUIRED
FOR
OPTION
#3
ONLY
PUMP 3
PUMP 2
PUMP 3
VOLTAGE
CONVERSION
SEE PAGE 10
Y - SPLITTER
The Y-Splitter (included) is required when choosing Option #3 on the setup menu (see
Pg. #24). You must have a topside control compatible with 3-pumps and a blower.
Please diagram for proper configurations.
25