GETTING STARTED
1
For the best installation possible, review all the provided instruction materials, and share
with your electrician/installer for advanced planning. A complete understanding of what's
needed before starting work will make things go smoothly, and at the lowest possible
cost.
This manual includes complete instructions for electrical and plumbing connections,
including the addition of pumps, gas heaters, lights, system startup, troubleshooting,
and your warranty guidelines.
First identify the Equipment System (ES) or Control System (CS) from your product
label. Refer to this code when using the GFCI breaker sizing matrix, and wiring diagrams
in this manual
ES series controls include a plastic mounting base, and main system pump. The
separate quick –start sheet #85-0115-4 has detailed instructions for pack assembly, and
pump cord installation
CS series controls are designed for a wall mount application. Your electrician must follow
all local codes and restriction pertaining to placement of an accessible electrical service.
* Copies of this manual are available online at www.hydroquip.com
Your Hydro-Quip 8000 series control has a factory pre set program. Details for changing
system behavior and/or adding new components will be found in this manual.
ATTENTION!
This manual includes instructions for all options available on the ES/CS systems.
Depending on how your system is equipped, some options like Plus Ozone
™
, Wi,
blowers, gas heaters etc may not apply to your installation.
Warning! Make no attempt to modify, disconnect, damage or adjust the safety devices
contained in this equipment system. Alteration of safety devices can cause serious
component damage, and/or result in unsafe operation leading to personal injury or death
Save a copy of this manual