108
OPERATION
Electronic control system
HBR204-MU-6-eng.doc
OPERATION AND MAINTENANCE INSTRUCTION MANUAL
THIS DOCUMENT IS THE PROPERTY OF HÜETTE BOHRTECHNIK GMBH - TOTAL OR PARTIAL REPRODUCTION IS PROHIBITED
4.4.3.3.
Machine setup (SETUP MACC.)
The following machine options can be set on the MACHINE SETUP page:
Tool and rod rotation head
Casing rotation head
Winch
Type of mast
Drill string chuck
Jet grouting
Jib
Re-calibration of winch hydraulic circuit (Y129)
PLC 5
Head translation operating in floating mode
“POWER PUMP” Power regulator “ON”
Head forward limit switch (S702)
Travel limit switch head back (S701)
Limit switch - Jet grouting extension (S810)
Wired safety devices on the mast
Cage protection device
Gas oil pump
Heat exchanger
Operation ON/OFF
Proportional operation
Rod loader
To access the setup of any of these options proceed as follows:
F1
–F2: Select the item you wish to
change.
F3:
Once selected the wanted
item, press pushbutton.
The first time you gain access to
parameter changing you will be asked
for a password.
The password will also be asked for
each time you attempt to change a
parameter that has an access level
higher than the one entered previously.
If the password keyed in is correct and of the appropriate level, it will be possible to modify the
parameter wanted.
F4: Save the settings
F5: Exit.
D17