![Hutt HBR 204 Operation And Maintenance Instruction Manual Download Page 111](http://html1.mh-extra.com/html/hutt/hbr-204/hbr-204_operation-and-maintenance-instruction-manual_2190084111.webp)
99
OPERATION
Electronic control system
OPERATION AND MAINTENANCE INSTRUCTION MANUAL
HBR204-MU-6-eng.doc
THIS DOCUMENT IS THE PROPERTY OF HÜETTE BOHRTECHNIK GMBH - TOTAL OR PARTIAL REPRODUCTION IS PROHIBITED
10
Warning and alarm messages
11
Failure type
12
Time and date
13
-
Indication of pressure in the head rotation circuit
-
Temperature of cooling liquid for diesel engine
14
Jet grouting parameters:
“STOP” : duration of the pause phase
“START” : duration of the extraction phase
15
Information on the state of the particulate filter:
■ The light is on at all times :
The cycle of regeneration of the particulate filter is in operation
■ The indicator light flashes :
The cycle of regeneration of the particle filter is about to be in operation
□ The light flashes slowly :
The cycle of regeneration of the particle filter is about to be
in operation
■ Do not turn off the diesel engine when the light is on or flashes at high frequency.
The particulate filter regeneration cycle lasts approximately 25 minutes.
□
The diesel engine has not reached the operating temperature.
D10