OPERATION MANUAL
V1.2.0en/11.12.20//0.3.1
KISS Immersion Circulator
7
Table of contents
V1.2.0en/11.12.20//0.3.1
Details on the declaration of conformity ....................................................... 12
Responsible bodies and operators – Obligations and requirements............... 14
Proper disposal of resources and consumables ......................................... 15
Lifting and transporting the temperature control unit ................................... 18
Temperature control unit with lifting eyes ................................................ 18
Temperature control unit without lifting eyes ........................................... 19
Positioning the temperature control unit ....................................................... 20
Temperature control unit with casters ...................................................... 20
Temperature control unit without casters ................................................. 20
Recommended temperature control and cooling water hoses ...................... 22
Temperature control units with cooler ......................................................... 23
Temperature control unit with batch ............................................................ 25
Unscrewing/activating the leveling feet (if any) ............................................. 25
Externally closed and externally open applications ........................................ 25
Connecting externally closed application ...................................................... 26
Connecting an externally closed application .................................................. 26
Connection using socket with protective earth (PE) ....................................... 27
Summary of Contents for KISS 1 Series
Page 1: ...KISS Immersion Circulator...
Page 2: ......
Page 3: ...OPERATION MANUAL KISS Immersion Circulator...
Page 4: ......
Page 10: ...OPERATION MANUAL KISS Immersion Circulator V1 2 0en 11 12 20 0 3 1 10...