![Huawei V100R006C00 Configuration Manual Download Page 31](http://html.mh-extra.com/html/huawei/v100r006c00/v100r006c00_configuration-manual_169533031.webp)
Switch B and Switch C having an empty configuration. Switch B and Switch C need to be directly
connected via a single hop. Both the interfaces connecting Switch B and Switch C should be in
the Up state, and should support NAP.
Figure 2-2
Networking diagram of NAP-based remote deployment
Network
SwitchA
PC
SwitchB
SwitchC
Configuration Roadmap
The configuration roadmap is as follows:
1.
Configure a primary IP address and a secondary IP address on Switch B.
2.
Configure a NAP master interface on Switch B.
3.
Telnet to Switch C from Switch B by means of NAP.
Data Preparation
None
Procedure
Step 1
Configuring the NAP master interface
# Do as follows on Switch B.
<Quidway>
system-view
[Quidway]
sysname SwitchB
[SwitchB]
interface gigabitethernet0/0/1
[SwitchB-GigabitEthernet0/0/1]
nap port master
Step 2
Logging in to the slave device from the master device.
# Do as follows on Switch B.
[SwitchB-GigabitEthernet0/0/1]
nap login neighbor
Trying 10.167.253.10 ...
Press CTRL+K to abort
Connected to 10.167.253.10 ...
Info: The max number of VTY users is 10, and the number
of current VTY users on line is 1.
Step 3
Shutting down NAP on the slave device.
# Do as follows on Switch C.
<Quidway>
system-view
[Quidway]
sysname SwitchC
[SwitchC]
undo nap slave enable
----End
Quidway S5700 Series Ethernet Switches
Configuration Guide - Device Management
2 NAP Configuration
Issue 01 (2011-07-15)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
22