Figure 6-44 Drilling holes and installing expansion sleeves
(1) M12 bolt
(2) Spring washer
(3) Flat washer
(4) Expansion sleeve
(5) Expansion nut
(6) Concrete floor
Step 3 Remove the UPS cabinet side panels.
Step 4 Remove the front panel from the bottom cabling cabinet.
Step 5 Combine the bottom cabling cabinet.
Figure 6-45 Combining the bottom cabling cabinet
Step 6 Secure the cabinets.
UPS5000-H-(400 kVA-800 kVA)
User Manual (100 kVA Power Module)
6 Installation
Issue 02 (2021-04-22)
Copyright © Huawei Technologies Co., Ltd.
92