UPS5000-E-(400 kVA-600 kVA)
User Manual (60 kVA Power Modules)
3 Installation
Issue 05 (2019-12-24)
Copyright © Huawei Technologies Co., Ltd.
59
Figure 3-8
Installing an expansion bolt (unit: mm)
1.
Drill holes in the ground by using a hammer drill. The hole depth is 52 mm to 60 mm.
2.
Partially tighten the expansion bolt and vertically insert it into the hole. Knock the
expansion bolt using a rubber mallet until the expansion sleeve is fully inserted into the
hole.
3.
Partially tighten the expansion bolt.
4.
Remove the bolt, spring washer, and flat washer.
Step 3
Use a pallet truck to move the cabinet to the installation position.
Step 4
Secure the cabinet to the expansion bolt holes on the ground using M12x60 expansion bolts.