SmartLogger1000
User Manual
3 Installation
Issue 12 (2019-01-15)
Copyright © Huawei Technologies Co., Ltd.
21
Figure 3-4
Drilling a hole and installing an expansion tubes and screws
describes the operations shown in
Table 3-2
Drilling a hole and installing an expansion tubes and screws
Step
Operation
1
Put a hammer drill with a Ф6 drill bit on a marked hole position perpendicularly
against the wall and drill holes with a depth of 24 mm to 25 mm.
NOTICE
To prevent dust inhalation or contact with eyes, wear safety goggles and an anti-dust
respirator when drilling holes.
Wipe away any dust in or around the holes and measure the hole distance. If the holes
are inaccurately positioned, drill holes again.
2
Vertically insert an expansion tube into a hole, and knock it completely into the
hole by using a rubber mallet.
3
Insert the screws into the expansion tube until the screw heads are 7.5 mm to 8
mm away from the wall.
Step 2
Hang the SmartLogger onto the secured screws by the mounting holes on the rear of the
SmartLogger.
Ensure that the area for connecting cables in the SmartLogger is downwards for the ease of
electrical connections and maintenance.
----End
3.5.3 Mounting the SmartLogger Along a Guide Rail
This topic describes how to mount the SmartLogger along a guide rail.
Context
The guide rails are not delivered together with the SmartLogger. If you need to mount the
SmartLogger along a guide rail, prepare a 35 mm wide guide rail.