SmartLogger1000
User Manual
7 WebUI
Issue 12 (2019-01-15)
Copyright © Huawei Technologies Co., Ltd.
195
No.
Parameter
Description
Unit
Value Range
Remarks
13
Remote
power
schedule
If this parameter is set to
Enable
, the inverter
responds to the scheduling
instruction from the
remote port. If this
parameter is set to
Disable
, the inverter does
not respond to the
scheduling instruction
from the remote port.
N/A
Disable
Enable
N/A
14
Schedule
instruction
valid duration
Adjusts the duration
within which the
scheduling instruction is
valid.
s
[0, 86400]
If this parameter is
set to
0
, the
instruction is valid
permanently.
15
Maximum
apparent
power
Specifies the output upper
threshold for the
maximum apparent power
to adapt to the capacity
requirements for standard
and customized inverters.
kVA
[Maximum active
power, Smax_limit]
If the maximum
active power equals
Smax_limit, this
parameter is not
displayed.
16
Maximum
active power
Specifies the output upper
threshold for the
maximum active power to
adapt to various market
requirements.
kW
[0.1, Pmax_limit]
N/A
17
Shutdown at
0% power
limit
If this parameter is set to
Enable
, the inverter shuts
down after receiving the
0% power limit
instruction. If this
parameter is set to
Disable
, the inverter does
not shut down after
receiving the 0% power
limit instruction.
N/A
Disable
Enable
N/A
18
Reactive
power
compensation
(Q/S)
Adjusts the inverter
output reactive power.
N/A
(–1.000, 1.000]
N/A
19
Reactive
power
compensation
(PF)
Adjusts the power factor
of the inverter.
N/A
(–1.000,
–0.800]U[0.800,
1.000]
N/A