SmartLogger1000
User Manual
3 Installation
Issue 12 (2019-01-15)
Copyright © Huawei Technologies Co., Ltd.
15
Figure 3-1
Installation flowchart
describes the installation process.
Table 3-1
Description of the installation process
Step
Operation
Description
1
Before unpacking, check that the outer packing
materials are intact. After unpacking, check that
deliverables are complete and intact.
2
Prepare tools required for installation and electrical
connections.
3
Determine the installation
position.
Before installing the SmartLogger, determine an
appropriate position to ensure that the
SmartLogger works properly.
4
The SmartLogger can be installed on a desk, a wall
or along a guide rail.