NetCol5000-A 42 kW Air Cooled In-row Precision Air
Conditioner
User Manual
3 Installation Guide
Issue 01 (2017-07-27)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
48
Figure 3-22
Securing a cabinet
----End
3.7.3 (Optional) Installing the Enclosure Frame
Procedure
Step 1
Open the front door. Remove the power cable of the display screen, FE cable, and the ground
cable for the front door. Then pull the front door upwards and remove it.
Step 2
Remove one bolt fixing plate, two connection plates, and two hinges.
Step 3
Move the enclosure frame to the front door, and adjust the anchor bolts of the enclosure frame
to ensure that the enclosure frame has the same height with the cabinet.
Step 4
Install the enclosure frame to the front door using eight M5 tapping screws.