NetCol5000-A 42 kW Air Cooled In-row Precision Air
Conditioner
User Manual
3 Installation Guide
Issue 01 (2017-07-27)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
36
Figure 3-10
Unpacking
2.
Inspect the cabinet exterior for signs of collision or scratches. If any damage is found,
contact the shipping company immediately.
Step 3
Check the type and quantity of fittings against the packing list. If fittings are missing or
inconsistent with those in the packing list, record the information and contact your local
Huawei office immediately.
----End
3.4 Checking the Nitrogen Pressure
Procedure
Step 1
Open the door lock using a key, and open the cabinet rear door.
Step 2
Unfasten the rotating baffle plates, and remove the air filters.