NetCol5000-A 42 kW Air Cooled In-row Precision Air
Conditioner
User Manual
5 Operation and Maintenance
Issue 01 (2017-07-27)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
214
Figure 5-64
Installing an SPD
Step 7
Reinstall the strong-current box, as shown by
in
Step 8
Power on the device, and ensure that the air conditioner works properly without alarms.
Step 9
Install the air filter and close the rear door.
----End
5.4.19 Replacing the Relay
Prerequisites
The relay, as shown in
, needs to be replaced.
A spare relay of the same model is available and functional.
Tool: Phillips screwdriver
Procedure
Step 1
On the controller home screen, tap
Shutdown
, and turn off the air conditioner switch in the
PDC.
Exercise caution because the device is still energized after it is shut down on the controller
home screen.
Step 2
Open the rear door and remove the air filter.
Step 3
Remove the relay cable, open the buckle on the relay mounting base, and pull out the relay.