FusionModule1000A40 Prefabricated All-in-One Data
Center
Installation Guide
8 Installing Devices Inside Pre-fab. Modules
Issue 03 (2020-06-09)
Copyright © Huawei Technologies Co., Ltd.
70
If the ejector is not pressed down, extinguishant may be released.
The electrical actuator ejector is 11 mm long before being pressed down, and 7 mm long
after being pressed down.
Figure 8-23
Operating the electrical actuator ejector
2.
Remove the protective cover at the electrical actuator installation position on the
container valve. Align the electrical actuator and the container valve, and tighten the
electrical actuator clockwise
----End
8.4.1.2 Connecting the Cable to the Battery of the Fire Control Panel
Prerequisites
The pre-fab. modules have been installed.
Preparations
The fire control panel battery has been installed before delivery. You only need to connect the
reserved cable to the battery onsite.
Tools: protective gloves
Materials: none
Skill requirement: common technician
Procedure
Step 1
Open the door of the fire control panel.
Step 2
Remove the protective foam from the battery and check whether the battery is intact or leaks.