Follow-up Procedure
After pre-fab. modules are hoisted and installed, verify the installation to ensure normal use of
products and smooth subsequent installation.
Table 4-2
Installation checklist
No.
Check Item
Check Method
Criteria
1
Contact between pre-fab.
modules and concrete
platforms
Observe.
A pre-fab. module is in
close contact with and
evenly supported by the
concrete platforms.
2
Bolts and nuts
Partially tighten them
using a wrench.
Bolts and nuts are
tightened.
3
Pre-fab. module doors
Open and close each
pre-fab. module door
once.
All pre-fab. module
doors can be smoothly
opened and closed.
4.2 (Optional) Base Installation Scenario
4.2.1 Determining the Pre-fab. Module Installation Position
Prerequisites
The field meets site requirements.
Before installing pre-fab. modules, check the height of concrete platforms and ensure
that the height (altitude) error between the upper surfaces of all platforms does not
exceed 5 mm.
Concrete platform levelness is critical to pre-fab. module installation. Ensure that the concrete
platform meet requirements before installing pre-fab. module bases.
Context
Before installing pre-fab. modules, determine their installation positions and directions based
on site space.