FusionModule1000A40 Prefabricated All-in-One Data
Center
Installation Guide
4 Installing Pre-fab. Modules
Issue 03 (2020-06-09)
Copyright © Huawei Technologies Co., Ltd.
26
Figure 4-11
Installing a twistlock for a single-capacity base
It is recommended that you tighten the base twistlocks after pre-fab. modules are hoisted in place.
----End
4.2.2 Removing the Pre-fab. Module Protective Cover
Prerequisites
The weather condition is good without rain or snow.
Context
A protective cover is installed to protect the pre-fab. module during transportation.
Preparations
Tools: safety helmet, safety belt, step ladder, protective gloves, utility knife
Materials: none
Skill requirement: common technician
Procedure
Step 1
Cut open the protective cover using a utility knife and remove the protective cover.
When removing the protective cover, take protective measures for working at heights.
----End