FusionModule1000A40 Prefabricated All-in-One Data
Center
Installation Guide
2 Site Requirements
Issue 03 (2020-06-09)
Copyright © Huawei Technologies Co., Ltd.
4
Figure 2-2
Base installation scenario diagram (unit: mm)
(1) Pre-fab. module base
(2) Concrete platform
(3) Ground
The minimum cross-sectional area of a concrete platform must be 2900 mm x 1000 mm. The
concrete platforms must be 200 mm higher than the ground to ensure efficient drainage.
Load-bearing capacity of concrete platforms: meets the requirements of the maximum
weight of a pre-fab. module 25,000 kg and NEBS Zone 3 antiseismic requirements.
Recommended load-bearing capacity calculation: Maximum weight of a pre-fab. module 25,000 kg x 3
(NEBS Zone 3 requires amplitude acceleration 3G) x 1.5 (0.5 times the engineering construction error
and margin)/Effective support contact area (The effective contact area in the concrete platform
installation scenario is 4 x 1700 cm
2
.)
The horizontal error between concrete platforms must be less than 10 mm.
Concrete pads or passages with the load-bearing capacity meeting local civil work
standards can be built on the site outside the concrete platforms for access and servicing.
2.3 Power Supply and Distribution Requirements
The power supply for the FusionModule1000 can be the mains or a diesel generator
(DG). For the detailed input routes and capacity, see the power supply and distribution
system diagram for the solution in use.