CA UTION
Store the removed screws and fasteners. Reinstall them after maintenance.
Step 2 Remove the sliding base fasteners for other cabinets inside the pre-fab. module in
the same way.
Figure 3-8 Removing the cabinet sliding base fasteners
----End
3.3 Daily Maintenance
Table 3-2 Daily maintenance checklist
Categor
y
Maintenan
ce Item
Method
Check Standard
Troubleshooting
Power
supply
and
distribut
ion
system
Integrated
UPS
Observe the power
input status
indicator.
Observe the
indicator
luminance, the
indicators are on.
If the input voltage is
abnormal, check the power
grid status and input cable
connection.
If the power supply is normal
but an indicator is off or
generates dim light, replace
the indicator.
ECC800-
Pro
WebUI
FusionDC1
000 alarms
On the ECC800-Pro
WebUI, choose
Home > Active
Alarms or Query >
Historical Alarms.
No alarm is
displayed in the
alarm information
area.
Clear alarms by referring to
the ECC800-Pro documents.
FusionDC1000A Prefabricated All-in-One Data
Center
Maintenance Guide (IT Scenario)
3 Routine Maintenance
Issue 01 (2021-04-20)
Copyright © Huawei Technologies Co., Ltd.
25