3. Log in to the WebUI of the ECC as an admin user. Choose Qery > Export Data
and set Data Type to the smart cooling product. TapExport Local Data of
Southbound Devices to back up data to the computer.
Step 2 Remove the controller panel.
CA UTION
● Do not frequently or quickly disconnect or connect the DP cable of the MDU.
Do not forcibly pull the DP cable.
● You are advised to power off the main control board or main control module
before replacing the MDU.
● If the main control board is not powered off, you are advised to back up the
configuration file of the product by referring to
or
.
1. Open the front door with caution to prevent damaging the controller cables.
2. Remove cables from the controller panel.
3. Remove the four screws from the controller panel using a Phillips screwdriver
and remove the gaskets, then pull out the controller panel and remove it.
NO TICE
– Be aware of the fasteners when pushing the controller panel from the right
or left side to prevent damaging the controller panel.
– The gasket is used to adjust the distance between the MDU and the door
panel.
– The gasket dimensions are 25 mm (L) x 12 mm (W) x 2 mm (H) and the
center aperture is 6 mm.
Figure 4-42 Replacing a controller panel
4. Install the new controller panel in the original position on the front door in an
inverse order.
FusionDC1000A Prefabricated All-in-One Data
Center
Maintenance Guide (IT Scenario)
4 Parts Replacement
Issue 01 (2021-04-20)
Copyright © Huawei Technologies Co., Ltd.
97