![Huawei FusionDC1000A Maintenance Manual Download Page 116](http://html.mh-extra.com/html/huawei/fusiondc1000a/fusiondc1000a_maintenance-manual_168032116.webp)
Step 6 Install the ECC800-Pro main control module in the card slot.
Step 7 Tighten the screws on both sides of the ECC800-Pro main control module.
Step 8 Reconnect signal cables to the ECC800-Pro main control module panel based on
the recorded information.
----End
4.3.5 Replacing a Smart ETH Gateway
Prerequisites
A spare ETH gateway of the same model is available and functional.
Impact on the System
Devices connected to the ETH gateway will be disconnected.
Preparations
Tools: ESD wrist strap, ESD gloves, Phillips screwdriver, step ladder, label, marker
Material: spare ETH gateway
Skill requirement: extra low voltage (ELV) engineer
Procedure
Step 1 Label each cable based on the corresponding ports on the smart ETH gateway.
Step 2 Disconnect cables from the smart ETH gateway.
Step 3 Remove the faulty smart ETH gateway from the guide rails of the cable trough.
Step 4 Install the spare smart ETH gateway in the original position and connect the
cables.
----End
4.3.6 Replacing a Camera
Prerequisites
A spare camera of the same model is available and functional.
Impact on the System
Video surveillance stops.
Preparations
Tools: Phillips screwdriver, step ladder, protective gloves
Material: spare camera
FusionDC1000A Prefabricated All-in-One Data
Center
Maintenance Guide (IT Scenario)
4 Parts Replacement
Issue 01 (2021-04-20)
Copyright © Huawei Technologies Co., Ltd.
108