4.4.14 Replacing Batteries for the ASD Power Box
Prerequisites
Spare ASD power box batteries of the same model are available and functional.
Impact on the System
None
Preparations
Tools: Phillips screwdriver, protective gloves
Materials: spare ASD power box batteries
Documents: fire extinguishing drawings and parameters
Skill requirement: fire engineer
Procedure
Step 1 Move the ASD power box batteries to the installation position indicated on the fire
extinguishing device layout diagram.
Step 2 Switch off the standby power supply for the ASD.
Figure 4-93 Switching off the standby power supply
Step 3 Disconnect cables from the faulty ASD batteries.
Step 4 Use a Phillips screwdriver to remove screws on the battery protective panel, and
remove the protective panel.
Step 5 Replace the batteries, and connect battery cables.