Hardware options installation 89
12.
If removed, install the BBWC battery pack or the FBWC capacitor pack ("
Installing the BBWC battery
pack or the FBWC capacitor pack
" on page
86
).
13.
Install fan 5.
14.
Install the access panel.
15.
Do one of the following:
o
Close or install the tower bezel, as needed.
o
Slide the server back into the rack.
16.
Power up the server (on page
22
, "
Powering up and configuring the server
" on page
40
).
Tower-to-rack conversion kit option
The tower-to-rack conversion kit includes all equipment required to convert the tower model server into a rack
model server and to install the server into most square- or round-hole racks.
The tower-to-rack conversion kit includes:
•
Rack-mounting hardware kit
•
Rack bezel
•
Front video connector cable
•
T-15 screws (6)
•
Screwlocks (2)
•
This document
In addition to the items supplied in the conversion kit, you will also need the following items:
•
A Torx T-15 screwdriver (clipped to the rear panel of the server)
•
A 3/16-in nut driver
To convert a tower model server to a rack model server:
1.
Power down the server (on page
22
).
2.
Disconnect all rear panel cabling.
Summary of Contents for ProLiant DL G6
Page 32: ...Operations 32 3 Remove the hard drive cage blank ...
Page 106: ...Cabling 106 Six bay LFF backplane cabling Drive cage bay 1 Drive cage bay 2 ...
Page 107: ...Cabling 107 Eight bay SFF drive cage cabling Drive cage bay 1 Drive cage bay 2 ...
Page 110: ...Cabling 110 DVD ROM drive cabling Slimline optical drive cabling ...
Page 115: ...Cabling 115 BBWC battery pack and FBWC capacitor pack cabling ...
Page 138: ...Troubleshooting 138 ...
Page 164: ...Technical support 164 ...
Page 165: ...Technical support 165 ...