Hardware options installation 90
3.
Remove the feet.
4.
Remove the tower bezel ("
Open or remove the tower bezel
" on page
22
).
5.
Remove the access panel (on page
25
).
6.
If installed, remove the BBWC battery pack or the FBWC capacitor pack (on page
27
).
7.
Remove fan 5 (on page
26
).
8.
Remove the air baffle (on page
28
).
9.
Remove the fan cage (on page
29
).
10.
Remove all SFF hard drives ("
Removing a hot-plug SAS hard drive
" on page
58
).
11.
Disconnect all cables from the drive cages.
12.
Remove the SFF drive cages.
For more information, see the server maintenance and service guide.
13.
Remove the hard drive cage blank (on page
31
).
14.
Remove the DVD-ROM drive (on page
31
), if installed.
15.
Remove the two-bay LFF drive cage, if installed.
For more information, see the server maintenance and service guide.
16.
(Optional) Reduce the weight of the server:
o
Remove the power supplies.
o
Remove all LFF hard drives and blanks.
o
Disconnect cabling and remove all devices from the removable media bays.
Summary of Contents for ProLiant DL G6
Page 32: ...Operations 32 3 Remove the hard drive cage blank ...
Page 106: ...Cabling 106 Six bay LFF backplane cabling Drive cage bay 1 Drive cage bay 2 ...
Page 107: ...Cabling 107 Eight bay SFF drive cage cabling Drive cage bay 1 Drive cage bay 2 ...
Page 110: ...Cabling 110 DVD ROM drive cabling Slimline optical drive cabling ...
Page 115: ...Cabling 115 BBWC battery pack and FBWC capacitor pack cabling ...
Page 138: ...Troubleshooting 138 ...
Page 164: ...Technical support 164 ...
Page 165: ...Technical support 165 ...