Hardware options installation 72
d.
Connect the LED cable to the two-bay LFF drive cage backplane and to the six-bay LFF backplane.
e.
Proceed to step 17.
16.
Connect the SAS/SATA controller cable:
a.
Connect the main branch of the SAS/SATA controller cable to an optional SAS controller ("
Storage
controller option
" on page
84
).
b.
Connect the "6LFF" labeled connector to the two-bay LFF drive cage backplane.
For this cabling scenario, the "2LFF" labeled connector is not used.
c.
Coil the excess cable to minimize the impact to airflow.
17.
Install the fan cage.
18.
Install the air baffle.
19.
If removed, install the BBWC battery pack or the FBWC capacitor pack ("
Installing the BBWC battery
pack or the FBWC capacitor pack
" on page
86
).
20.
Install fan 5.
Summary of Contents for ProLiant DL G6
Page 32: ...Operations 32 3 Remove the hard drive cage blank ...
Page 106: ...Cabling 106 Six bay LFF backplane cabling Drive cage bay 1 Drive cage bay 2 ...
Page 107: ...Cabling 107 Eight bay SFF drive cage cabling Drive cage bay 1 Drive cage bay 2 ...
Page 110: ...Cabling 110 DVD ROM drive cabling Slimline optical drive cabling ...
Page 115: ...Cabling 115 BBWC battery pack and FBWC capacitor pack cabling ...
Page 138: ...Troubleshooting 138 ...
Page 164: ...Technical support 164 ...
Page 165: ...Technical support 165 ...