Operations 27
IMPORTANT:
When installing or replacing server components, one or more fans might need to
be removed. To prevent an orderly or immediate server shutdown, HP highly recommends
powering down the server during these procedures. To determine if powering down is required,
see the specific procedure.
To remove the component:
1.
Power down the server (on page
22
).
2.
Do one of the following:
o
Open or remove the tower bezel, as needed ("
Open or remove the tower bezel
" on page
22
).
o
Extend the server from the rack (on page
24
).
3.
Remove the access panel (on page
25
).
4.
Remove the fan from the air baffle.
To replace the component, reverse the removal procedure.
Remove the BBWC battery pack or the FBWC
capacitor pack
CAUTION:
To prevent a server malfunction or damage to the equipment, do not add or remove
the battery pack while an array capacity expansion, RAID level migration, or stripe size migration
is in progress.
CAUTION:
After the server is powered down, wait 15 seconds and then check the amber LED
before unplugging the cable from the cache module. If the amber LED blinks after 15 seconds, do
not remove the cable from the cache module. The cache module is backing up data, and data is
lost if the cable is detached.
To remove the component:
1.
Power down the server (on page
22
).
2.
Do one of the following:
Summary of Contents for ProLiant DL G6
Page 32: ...Operations 32 3 Remove the hard drive cage blank ...
Page 106: ...Cabling 106 Six bay LFF backplane cabling Drive cage bay 1 Drive cage bay 2 ...
Page 107: ...Cabling 107 Eight bay SFF drive cage cabling Drive cage bay 1 Drive cage bay 2 ...
Page 110: ...Cabling 110 DVD ROM drive cabling Slimline optical drive cabling ...
Page 115: ...Cabling 115 BBWC battery pack and FBWC capacitor pack cabling ...
Page 138: ...Troubleshooting 138 ...
Page 164: ...Technical support 164 ...
Page 165: ...Technical support 165 ...