Hardware options installation 86
6.
Install the cache module.
7.
Install the access panel.
8.
Do one of the following:
o
Close or install the tower bezel, as needed.
o
Slide the server back into the rack.
9.
Power up the server (on page
22
, "
Powering up and configuring the server
" on page
40
).
Installing the BBWC battery pack or the FBWC capacitor pack
CAUTION:
Do not use this controller with cache modules designed for other controller models,
because the controller can malfunction and you can lose data. Also, do not transfer this cache
module to a different controller module, because you can lose data.
To install the component:
1.
Back up all data.
2.
Close all applications.
3.
Power down the server (on page
22
).
CAUTION:
In systems that use external data storage, be sure that the server is the first unit to be
powered down and the last to be powered back up. Taking this precaution ensures that the system
does not erroneously mark the drives as failed when the server is powered up.
4.
Do one of the following:
o
Unlock and remove the bezel ("
Open or remove the tower bezel
" on page
22
).
o
Extend the server from the rack (on page
24
).
5.
Remove the access panel (on page
25
).
6.
Install the cache module ("
Installing the cache module
" on page
85
).
7.
Install the storage controller ("
Storage controller option
" on page
84
), if not already installed.
Summary of Contents for ProLiant DL G6
Page 32: ...Operations 32 3 Remove the hard drive cage blank ...
Page 106: ...Cabling 106 Six bay LFF backplane cabling Drive cage bay 1 Drive cage bay 2 ...
Page 107: ...Cabling 107 Eight bay SFF drive cage cabling Drive cage bay 1 Drive cage bay 2 ...
Page 110: ...Cabling 110 DVD ROM drive cabling Slimline optical drive cabling ...
Page 115: ...Cabling 115 BBWC battery pack and FBWC capacitor pack cabling ...
Page 138: ...Troubleshooting 138 ...
Page 164: ...Technical support 164 ...
Page 165: ...Technical support 165 ...