Setup 39
6.
Push the tab into place to secure the power cord.
7.
Connect the power cord to the AC power source.
WARNING:
To reduce the risk of electric shock or damage to the equipment:
•
Do not disable the power cord grounding plug. The grounding plug is an important safety
feature.
•
Plug the power cord into a grounded (earthed) electrical outlet that is easily accessible at all
times.
•
Unplug the power cord from the power supply to disconnect power to the equipment.
•
Do not route the power cord where it can be walked on or pinched by items placed against it.
Pay particular attention to the plug, electrical outlet, and the point where the cord extends from
the server.
Installing the server into the rack
To install the server into a rack with square, round, or threaded holes, refer to the instructions that ship with
the rack hardware kit.
If you are installing the server into a telco rack, order the appropriate option kit at the RackSolutions.com
website (
http://www.racksolutions.com/hp
). Follow the server-specific instructions on the website to install
the rack brackets.
CAUTION:
Always plan the rack installation so that the heaviest item is on the bottom of the rack.
Install the heaviest item first, and continue to populate the rack from the bottom to the top.
Summary of Contents for ProLiant DL G6
Page 32: ...Operations 32 3 Remove the hard drive cage blank ...
Page 106: ...Cabling 106 Six bay LFF backplane cabling Drive cage bay 1 Drive cage bay 2 ...
Page 107: ...Cabling 107 Eight bay SFF drive cage cabling Drive cage bay 1 Drive cage bay 2 ...
Page 110: ...Cabling 110 DVD ROM drive cabling Slimline optical drive cabling ...
Page 115: ...Cabling 115 BBWC battery pack and FBWC capacitor pack cabling ...
Page 138: ...Troubleshooting 138 ...
Page 164: ...Technical support 164 ...
Page 165: ...Technical support 165 ...