![Horizon Reverse Osmosis Seafari Versatile SFC-1400-2 Owner'S Manual Download Page 137](http://html1.mh-extra.com/html/horizon-reverse-osmosis/seafari-versatile-sfc-1400-2/seafari-versatile-sfc-1400-2_owners-manual_2163420137.webp)
HRO
Systems
Horizon
Seafari
Self Contained and Modular Style
RECOMMENDED CIRCUIT BREAKER:
HORIZON SEAFARI SYSTEMS
Operating Voltage 115 VAC, Single Phase
Circuit Breaker Size 30 Amperes
Operating Voltage 230 VAC, Single Phase
Circuit Breaker Size 15 Amperes
Operating Voltage 208 VAC, Three Phase
Circuit Breaker Size 10 - 15 Amperes
Operating Voltage 230 VAC, Three Phase
Circuit Breaker Size 10 Amperes
Operating Voltage 380 VAC, Three Phase
Circuit Breaker Size 7.5 - 10 Amperes
Operating Voltage 460 VAC, Three Phase
Circuit Breaker Size 5 - 7.5 Amperes
RECOMMENDED COPPER WIRE & SIZE FOR
MAIN POWER FEED LINE
Operating Voltage 115 VAC, Single Phase
Minimum Power Line Wire Size 10 AWG
Operating Voltage 230 VAC, Single Phase
Minimum Power Line Wire Size 12 AWG
Operating Voltage 208 VAC, Three Phase
Minimum Power Line Wire Size 12 AWG
Operating Voltage 230 VAC, Three Phase
Minimum Power Line Wire Size 12 AWG
Operating Voltage 380 VAC, Three Phase
Minimum Power Line Wire Size 12 AWG
Operating Voltage 460 VAC, Three Phase
Minimum Power Line Wire Size 12 AWG
MOTOR ROTATION:
Single Phase Systems:
The High Pressure Pump Electric Motor
rotation is pre-wired by HRO prior to
shipment.
The Booster Pump Motor rotation is controlled
by interchanging two specific wires at the
Electric Motors wiring box.
Three Phase Systems
The High Pressure Pump and Booster Pump
Electric Motor rotation is controlled by
interchanging any two of the three power lines
at the Electric Motors wiring box connections.
WIRING CONNECTIONS
Refer to each individual Electrical Motor, which
include attached name plate with wiring diagram
or separate wiring diagram plate, decal or label.
NOTE:
Use the following procedure when
changing motor voltage as shown on pages
Appendix - 7 through Appendix - 12. Wire nuts
are supplied when system is shipped and are taped
inside controller lid for voltage modifications.
1. Cut crimped motor leads as close to the
crimped terminal.
2. Wires which, need to be jumpered (connected)
must be stripped with stripped length not
exceeding ½”.
3. When two wires are jumpered, use the supplied
blue wire nuts. When three wires are
jumpered, use the supplied yellow wire nuts.
4. Do not over-tighten wire nuts.
Single-Phase System Rotation:
JOG TO CHECK ROTATION BEFORE
OPERATING. TO REVERSE ROTATION
INTERCHANGE MOTOR LEADS 5 AND 8
LOCATED INSIDE THE REAR COVER.
HOWEVER, WIRING CONNECTIONS
LISTED ABOVE ARE PROPER FOR THE
SEA RECOVERY SYSTEM.
Three-Phase System Rotation:
JOG TO CHECK ROTATION BEFORE
OPERATING. THREE PHASE MOTORS
ONLY - TO REVERSE ROTATION
INTERCHANGE ANY TWO POWER
LEADS.
APPENDIX A.2
Summary of Contents for Seafari Versatile SFC-1400-2
Page 7: ...HROSystems Horizon Seafari Self Contained and Modular Style NOTES vi...
Page 8: ...SECTION A WARRANTY...
Page 10: ...HRO Systems Horizon Seafari Self Contained and Modular Style Page A 2 NOTES...
Page 11: ...SECTION B SPECIFICATIONS...
Page 17: ...HROSystems Horizon Seafari Self Contained and Modular Style NOTES Page B 6...
Page 18: ...SECTION C INTRODUCTIONS...
Page 22: ...HROSystems Horizon Seafari Self Contained and Modular Style Page C 4 NOTES...
Page 23: ...SECTION D SYSTEM SCHEMATIC WITH COMPONENT IDENTIFICATIONS COMPONENT DESCRIPTIONS...
Page 31: ...HROSystems Horizon Seafari Self Contained and Modular Style Page D 8 NOTES...
Page 32: ...SECTION E SYSTEM INSTALLATION PROCEDURE...
Page 61: ...HROSystems Horizon Seafari Self Contained and Modular Style Page F 10 NOTES...
Page 63: ...HROSystems Horizon Seafari Self Contained and Modular Style Page F 12 NOTES...
Page 64: ...SECTION G SYSTEM START UP PROCEDURE...
Page 69: ...HROSystems Horizon Seafari Section G System Start Up Procedure Page G 5...
Page 70: ...SECTION H SHUTDOWN PROCEDURE...
Page 74: ...SECTION I SYSTEM TROUBLESHOOTING GUIDE...
Page 90: ...HROSystems Horizon Seafari Self Contained and Modular Style Page I 16...
Page 114: ...SECTION L EXPLODED PARTS VIEWS WITH DESCRIPTION PART NUMBERS...
Page 135: ...APPENDIX A WIRING INFORMATION DIAGRAMS...
Page 148: ...APPENDIX B...
Page 156: ...HROSystems Horizon Seafari Self Contained and Modular Style APPENDIX B 8 NOTES NOTES...