MAINTENANCE
7-11
Maintenance Guide
A. Greasing
Parts
Quantity
Interval (hours)
Page
8
50
100 250 500 1000 2000
1.
Front Joint Pins
Bucket and
Link Pins
ZX33U-5A, 38U-5A,
48U-5A, 55U-5A
5
7-19
ZX65USB-5A
6
7-19
Swing Post and Others
10
or every year
7-19
2.
Blade Pins
4
or every year
7-21
3. Swing Bearing
2
7-22
4.
Swing Internal Gear
1
7-23
5. Control Lever Universal Joint
2
or every year
7-23
:
In case excavations are performed in water, grease the pin after operation is complete.
:
Grease all pins every 100 hours during first time operation up to 500 hours.
IMPORTANT: Grease front joint pins every day until break-in operation (50 hours) is complete.
B. Engine
Parts
Quantity
Interval (hours)
Page
8
50
100
250
500 1000 2000
1.
Engine Oil
Check Oil Level
1
7-24
2.
Engine Oil
Change
ZX33U-5A, 38U-5A
6.7 L
(1.8 US gal)
ZX48U-5A, 55U-5A
7.4 L
(2.0 US gal)
7-25
ZX65USB-5A
10.5 L
(2.8 US gal)
3. Engine Oil Filter
Replace
1
7-25
: As the oil life is shortened more than normal under high temperature operation condition, shorten the
maintenance interval.
C. Transmission
Parts
Quantity
Interval (hours)
Page
8
50
100
250
500 1000 2000
1.
Travel Reduction
Gear
Check Oil Level
2
7-28
Change
ZX33U-5A, 38U-5A
0.6 L×2
(0.63 US qt)
7-29
ZX48U-5A, 55U-5A,
65USB-5A
0.9 L×2
(0.95 US qt)
7-29
Summary of Contents for Zaxis 33U-5A
Page 4: ......
Page 66: ...SAFETY SIGNS S 54 MEMO ...
Page 104: ...OPERATOR S STATION 1 38 Radio Cab equipped machine Optional 1 Radio Clock 1 MADB 01 005 ...
Page 114: ...BREAK IN 2 2 MEMO ...
Page 160: ...OPERATING THE MACHINE 5 28 MEMO ...
Page 270: ...MAINTENANCE 7 102 MEMO ...
Page 272: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 2 MEMO ...
Page 274: ...STORAGE 10 2 MEMO ...