MAINTENANCE
7-53
Check Fuel Level
--- every 8 hours (daily)
d
CAUTION: Handle fuel carefully. Shut the engine off
before fueling. Do not smoke while you fill the fuel
tank or work on fuel system.
1. Park the machine following the same procedures as
described on page 7-7 for preparation for inspection and
maintenance.
2. Check fuel level gauge (3) and fuel gauge (1) of the
monitor panel. When necessary to add fuel, remove cap
(2) and refill fuel.
IMPORTANT: Keep all dirt, dust, water and other foreign
materials out of the fuel system when refilling fuel.
3. To avoid condensation, fill the tank at the end of
each day’s operation. Take care not to spill fuel on the
machine or ground.
Model
Tank Capacity
ZX33U-5A, 38U-5A
42 L (11.1 US gal)
ZX48U-5A, 55U-5A
70 L (18.5 US gal)
ZX65USB-5A
120 L (31.7 US gal)
4. After refilling fuel, install cap (2). Close tank cover (4) and
be sure to lock cover (4) to prevent vandalism.
1
3
2
MADB-00-007
MADB-07-041
4
Summary of Contents for Zaxis 33U-5A
Page 4: ......
Page 66: ...SAFETY SIGNS S 54 MEMO ...
Page 104: ...OPERATOR S STATION 1 38 Radio Cab equipped machine Optional 1 Radio Clock 1 MADB 01 005 ...
Page 114: ...BREAK IN 2 2 MEMO ...
Page 160: ...OPERATING THE MACHINE 5 28 MEMO ...
Page 270: ...MAINTENANCE 7 102 MEMO ...
Page 272: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 2 MEMO ...
Page 274: ...STORAGE 10 2 MEMO ...