OPERATING THE MACHINE
5-14
Grading Operation
Use the blade for soil refilling and general grading operations
after excavation. Grading operation can be also performed by
operating the boom, arm, and bucket simultaneously.
IMPORTANT: Do not pull or push dirt with the bucket
when traveling. Excess force will be applied on each
part, and the machine may be damaged.
When grading by operating the boom, arm, and bucket
simultaneously:
1. When grading from the forward to the backward, slowly
roll in the arm while slightly raising the boom. As soon
as the arm passes the vertical position, slowly lower the
boom so that the bucket can be horizontally moved.
2. When grading from the backward to the forward,
operate the arm and bucket rolled back as described in
step 1.
Do the slope finishing work in the same procedure as
described in steps 1 and 2.
M1M7-05-012
Summary of Contents for Zaxis 33U-5A
Page 4: ......
Page 66: ...SAFETY SIGNS S 54 MEMO ...
Page 104: ...OPERATOR S STATION 1 38 Radio Cab equipped machine Optional 1 Radio Clock 1 MADB 01 005 ...
Page 114: ...BREAK IN 2 2 MEMO ...
Page 160: ...OPERATING THE MACHINE 5 28 MEMO ...
Page 270: ...MAINTENANCE 7 102 MEMO ...
Page 272: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 2 MEMO ...
Page 274: ...STORAGE 10 2 MEMO ...