MAINTENANCE
7-65
ZX48U-5A, 55U-5A
1. Remove bolts (1) (5 used). Remove cover (2) to open
checking port.
2. Loosen mounting bolts (6) and nut (3) of alternator (5).
3. Adjust belt tension by moving alternator (5) forward or
backward by using adjusting screw (4).
4. Securely tighten bolts (6) and nut (3).
IMPORTANT: When a new belt is installed, be sure to re-
adjust the tension after operating the engine for 3 to 5
minutes at slow idle speed to be sure that the new belt
is seated correctly.
1
1
2
3
4
5
6
6
MADB-07-050
MADB-07-049
Summary of Contents for Zaxis 33U-5A
Page 4: ......
Page 66: ...SAFETY SIGNS S 54 MEMO ...
Page 104: ...OPERATOR S STATION 1 38 Radio Cab equipped machine Optional 1 Radio Clock 1 MADB 01 005 ...
Page 114: ...BREAK IN 2 2 MEMO ...
Page 160: ...OPERATING THE MACHINE 5 28 MEMO ...
Page 270: ...MAINTENANCE 7 102 MEMO ...
Page 272: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 2 MEMO ...
Page 274: ...STORAGE 10 2 MEMO ...