OPERATING THE MACHINE
5-2
Boom-Swing Pedal
Use the boom swing function to efficiently operate the
machine when excavating grooves along roadsides or
near walls. The boom swing operation is performed using
boom-swing pedal (1) located at the operator’s right foot as
illustrated to the right.
Boom-Swing Operation
1. Turn cover (2) for boom-swing pedal (1) forward.
2. Step on the left side of boom-swing pedal (1) to swing
left. Step on the right side of pedal (1) to swing right.
3. Turn cover (2) backward over boom-swing pedal (1)
when boom-swing operation is no longer required.
3- Swing Left
4- Swing Right
3
4
2
1
Unlock Position
2
Lock Position
MADB-05-001
MADB-01-062
MADB-00-001
Summary of Contents for Zaxis 33U-5A
Page 4: ......
Page 66: ...SAFETY SIGNS S 54 MEMO ...
Page 104: ...OPERATOR S STATION 1 38 Radio Cab equipped machine Optional 1 Radio Clock 1 MADB 01 005 ...
Page 114: ...BREAK IN 2 2 MEMO ...
Page 160: ...OPERATING THE MACHINE 5 28 MEMO ...
Page 270: ...MAINTENANCE 7 102 MEMO ...
Page 272: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 2 MEMO ...
Page 274: ...STORAGE 10 2 MEMO ...