MAINTENANCE
7-46
9
10
8
7
6
4
5
12
13
12
13
11
Interval (hours)
Check Points
Abnormalities
Remedies
Every 250
hours
Hose covers
Damage or leak (4)
Replace
Hose ends
Damage or leak (5)
Replace
Hose covers
Exposed reinforcement (6)
Replace
Hose covers
Crack or blister (7)
Replace
Hose
Bend (8), Collapse (9)
Replace
Hose ends and
Fittings
Deformation or corrosion (10)
Replace
Lines
Interval (hours)
Check Points
Abnormalities
Remedies
Daily
Contact surfaces of flange joints
Leak (11)
Replace
Bolts
Loose or leak (11)
Retighten or
replace O-ring
Welded surfaces on flange joints Leak (12)
Replace
Every 250
hours
Flange joint neck
Crack (13)
Replace
Welded surfaces on flange joints Crack (12)
Replace
Clamps
Missing or deformation
Loose bolts
Replace or
retighten
Oil Cooler
Interval (hours)
Check Points
Abnormalities
Remedies
Every 250
hours
Coupling
Leak (14)
Retighten or replace
Oil Cooler
Leak (15)
Replace
M115-07-146
M115-07-147
M115-07-148
M115-07-149
M137-07-001
M137-07-007
15
14
MADB-07-021
Summary of Contents for Zaxis 33U-5A
Page 4: ......
Page 66: ...SAFETY SIGNS S 54 MEMO ...
Page 104: ...OPERATOR S STATION 1 38 Radio Cab equipped machine Optional 1 Radio Clock 1 MADB 01 005 ...
Page 114: ...BREAK IN 2 2 MEMO ...
Page 160: ...OPERATING THE MACHINE 5 28 MEMO ...
Page 270: ...MAINTENANCE 7 102 MEMO ...
Page 272: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 2 MEMO ...
Page 274: ...STORAGE 10 2 MEMO ...