1.3 Measurement Overview
18
Flow of measurement
Before starting measurement, check the fol-
lowing:
• The power supply method.
• The power ON/OFF method.
• That date and time are set.
• Connection of test leads, temperature
sensor, and USB cable.
Insulation Resistance Measurement
→
3.2 "Measuring Insulation Resistance" (page 56)
1
Prepare for measurement
→
2 "Measurement Preparations" (page 31)
2
Start measurement.
1.
Make sure that power supply to the object under
test is turned off.
2.
Press the
key to turn on
the tester.
❖
2.2 (page 44)
www.
.com
1.800.561.8187