2.4 Connecting Test Lead
1
2
3
4
5
6
7
8
9
10
11
付録
索引
51
3.
Connect the red test lead to the + terminal
and the black test lead to the - terminal.
For insulation resistance measurement,
connect the blue test lead to the GUARD
terminal if necessary.
Check that the test leads are fully
inserted.
❖
GUARD terminal
→
See 3.2.7 "Use of GUARD
Terminal" (page 71).
+ terminal
- terminal
GUARD
terminal
Test lead (Red)
Test lead (Black)
www.
.com
1.800.561.8187