![HighLine Bale Pro CFR651 Operator'S Manual Download Page 63](http://html1.mh-extra.com/html/highline/bale-pro-cfr651/bale-pro-cfr651_operators-manual_2130606063.webp)
Section 5 - Maintaining the CFR 651
Flail Replacement Procedure
Replace flails that are broken or worn to the
point that they will not process material
properly.
Before beginning, make sure the
tractor is off and the PTO is
disengaged. Disconnect the
driveline from the tractor before
doing any work.
Securely block the CFR 651
before any work is done to prevent
the CFR 651 from moving during
servicing.
1. Remove the flail to be replaced.
-
Remove the nut (4) and bolt (5) that
holds the flail (3) to the drum (1).
2. Remove the pipe (2) inside the flail.
-
This pipe will be used again.
3. Remove the flail that is on the opposite
side of the flail drum.
Note: To maintain rotary balance, the flail
on the opposite side of the drum must be
replaced at the same time.
4. Install the 2 new flails with the pipe, bolt
and nut between the tabs on the drum.
-
Ensure that the bent portion of the flail
leads into the rotation of the drum.
5. Torque the nuts to minimum of 180 ft-lb
(244 Nm) - maximum of 240 ft-lb (325
Nm).
6. Check that the flail freely moves between
the tabs on the drum.
Flail Replacement
40524_B
Page 5-10
Summary of Contents for Bale Pro CFR651
Page 1: ...O p e r a t o r s M a n u a l E12033V3_A Bale Pro Complete Feed Ration CFR651...
Page 7: ...This Page Left Blank...
Page 17: ...Section 1 Safety 216197 SAFETY DECAL LOCATIONS Page 1 10...
Page 43: ...Section 3 Preparing the CFR 651 This Page Left Blank Page 3 18...
Page 71: ...Section 6 Storing the CFR 651 This Page Left Blank Page 6 6...