![HighLine Bale Pro CFR651 Operator'S Manual Download Page 51](http://html1.mh-extra.com/html/highline/bale-pro-cfr651/bale-pro-cfr651_operators-manual_2130606051.webp)
Section 4 - Operating the CFR 651
8. Begin processing material.
-
Start the feeder chain to move the
bale towards the flail drum.
Note: If
the
processor
vibrates
e x c e s s i v e l y ,
i m m e d i a t e l y
disengage PTO and stop the
tractor.
Wait for all flail drum rotation to
stop before approaching the
processor.
Inspect for blockages, missing
flails or other causes of the
vibration.
9. Adjust the feeder chain speed and
direction.
-
If loose material builds up near the
top of the bale in the tub:
-
slow down the feeder chain to
allow the flail drum to process
the material.
-
slow down the feeder chain to
avoid the feeder chain from
removing material from the
bale.
-
To remove loose material buildup,
reverse the feeder chain for a short
time and then restore the chain
direction to move the bottom of the
bale towards the flail drum.
Adjust Feeder Chain Speed and Direction
216100
Page 4-8
Summary of Contents for Bale Pro CFR651
Page 1: ...O p e r a t o r s M a n u a l E12033V3_A Bale Pro Complete Feed Ration CFR651...
Page 7: ...This Page Left Blank...
Page 17: ...Section 1 Safety 216197 SAFETY DECAL LOCATIONS Page 1 10...
Page 43: ...Section 3 Preparing the CFR 651 This Page Left Blank Page 3 18...
Page 71: ...Section 6 Storing the CFR 651 This Page Left Blank Page 6 6...