![HighLine Bale Pro CFR651 Operator'S Manual Download Page 41](http://html1.mh-extra.com/html/highline/bale-pro-cfr651/bale-pro-cfr651_operators-manual_2130606041.webp)
Section 3 - Preparing the CFR 651
12.
Place twine cutter back into the
storage position.
-
Ensure the handle is facing down and
is locked into the key hole slot.
13.
Unlock the flail drum.
-
Remove the drum lock pin from the
flail drum drive plate tube (1).
Note: Failure to unlock the flail drum will
result in damage to the machine
during start up.
-
Place the drum lock pin into the
storage holder on the outside of the
drive shield.
Replace Twine Cutter Into Storage Position
212070
Remove the Flail Drum Lock
213179C
Store Lock Pin on Outside of Shield
213186
Page 3-16
Summary of Contents for Bale Pro CFR651
Page 1: ...O p e r a t o r s M a n u a l E12033V3_A Bale Pro Complete Feed Ration CFR651...
Page 7: ...This Page Left Blank...
Page 17: ...Section 1 Safety 216197 SAFETY DECAL LOCATIONS Page 1 10...
Page 43: ...Section 3 Preparing the CFR 651 This Page Left Blank Page 3 18...
Page 71: ...Section 6 Storing the CFR 651 This Page Left Blank Page 6 6...