3.4
Rails Replacement
Table 30: Replacement Procedure Info
Time Required
# of People Required
Required Tools
15 minutes
1
#2 Phillips Screwdriver
1.
Power Off the enclosure.
a) In the Web UI, click Power Control.
The Power Control page will appear.
Figure 38: Power Control
b) Select the option next to ACPI Shutdown and click Perform Action.
A message "Are you sure to perform this operation?" will appear.
Figure 39: Are You Sure...
c) Click OK.
The enclosure will Power Off.
Figure 40: Power Off
2.
From the rear of the enclosure, disconnect the all of the cables attached to the enclosure.
a) Remove the 10G SFP+ cable from the NIC port (1).
b) Remove the Ethernet cable from the enclosure (2).
48
3
Part Replacement
User Guide
3.4
Rails Replacement