a) Locate the socket alignment pin on the baseboard and the alignment hole on the Heat Sink.
b) Carefully place the CPU and Heat Sink module in position on the socket alignment pins.
c) The Heat Sink must be installed by tightening the Torx T30 screws in a specific order. Use the following
diagram to determine the specific order.
109
3
Part Replacement
User Guide
3.8
Heat Sink Replacement