9
Menu navigation and adjustment values
24
9.2
T-CONTROL
The T-CONTROL is positioned on the Outside of the Log wood boiler. Every single T-CONTROL parameter
is explained in chapter 9.13.
figure 9. 1: T-CONTROL
9.3
Starting the system
To switch on the display, the following condition must be fulfilled:
◼
The boiler must be connected to the power supply
(see figure 9.2)
1 … Cable ducts
2 ... Main switch
3 … Electric supply
figure 9.2: Plug on the boiler for preparation of the power supply
If it is fulfilled, the starting process of the display, which takes 1-2 minutes, starts.
Summary of Contents for pelletfire 20/20
Page 1: ...OPERATING INSTRUCTIONS Log wood pellet heating system pelletfire 20 40 ...
Page 90: ...15 Annex 90 15 ANNEX 15 1 Additional boiler module Hydraulic recommendation 1 ...
Page 91: ...Annex 15 91 Hydraulic recommendation 2 ...
Page 92: ...15 Annex 92 15 2 Solar module Program 1 ...
Page 93: ...Annex 15 93 Program 2 ...
Page 94: ...15 Annex 94 Program 3 ...
Page 95: ...Annex 15 95 Program 4 ...
Page 96: ...15 Annex 96 Program 5 ...
Page 97: ...Annex 15 97 Program 6 ...
Page 98: ...16 Notes 98 16 NOTES ...
Page 99: ...Notes 16 99 ...