A
B
C
D
E
F
G
H
I
159
2420331560
E 04 07
GB
TELESCOPIC HANDLERS
H
- LUBRIFICATION AND MAINTENANCE
14 - Every 1500 hours of opera-
tion
14.1 - TRAVEL AXLES
The oil replacement operations must be performed periodically, respecting the maintenance
schedule provided.
It is recommended that you intervene immediately in the event of leaks or other faults resulting in a
drop in oil levels to avoid any possible damage to the mechanical components.
Once you have removed the filling and drainage plugs, they should be closed again by tightening
using a torque wrench with the torque intended by the manufacturer.
Perform the first drainage after the first 250 hours of operation.
Summary of Contents for HTL4014
Page 2: ......
Page 4: ...Operator manual ...
Page 22: ...16 2420331560 E 04 07 GB TELESCOPIC HANDLERS ...
Page 28: ...22 2420331560 E 04 07 GB TELESCOPIC HANDLERS S p e c i f i c l a b e l s R9 R10 ...
Page 64: ...58 2420331560 E 04 07 GB TELESCOPIC HANDLERS ...
Page 83: ...A B C D E F G H I 77 2420331560 E 04 07 GB TELESCOPIC HANDLERS G TECHNICAL SPECIFICATIONS N O ...
Page 178: ...172 2420331560 E 04 07 GB TELESCOPIC HANDLERS Probable cause ...
Page 194: ...188 2420331560 E 04 07 GB HYDRAULIC DIAGRAM Telescopics handlers ...