Propeller Owner's Manual
136
INSTALLATION AND REMOVAL
61-00-36
Page 3-1
Rev. 2 Feb/17
INSTALLATION AND REMOVAL - CONTENTS
1. Tools, Consumables, and Expendables ...................................3-5
A. Tooling ...............................................................................3-5
B. Consumables .....................................................................3-6
C. Expendables ......................................................................3-6
2. Pre-Installation .........................................................................3-7
A. Inspection of Shipping Package ........................................3-7
B. Uncrating ...........................................................................3-7
C. Inspection after Shipment ..................................................3-7
D. Reassembly of a Propeller Disassembled for Shipment ...3-7
3. Spinner Pre-Installation ..........................................................3-11
A. General ............................................................................3-11
B. Installation of a Metal Spinner Bulkhead
on a Propeller Hub ...........................................................3-14
C. Installation of a Composite Spinner Bulkhead on a
Propeller Hub ...................................................................3-19
to Starter Ring Gear Installation ......................................3-23
4. Pressure Gauge Attachment to the Pressure Control Unit ....3-29
5. Pressure Control Unit and Governor Installation ...................3-31
A. Before Installation ............................................................3-31
B. Preparing the Governor Mounting Pad on the Engine. ....3-35
C. Installing the Pressure Control Unit and the Governor ....3-41
D. Pressure Control Unit Adjustment ...................................3-43
6. Propeller Installation ..............................................................3-53
A. Flange Description ...........................................................3-53
B. Installation of “R” Flange Propellers ................................3-53
7. Spinner Dome Installation ......................................................3-58
A. General ............................................................................3-58
B. Installing the Spinner Dome ............................................3-58
8. Post-Installation Checks ........................................................3-59
9. Pressure Control Unit and Governor Removal ......................3-61
10. Spinner Removal ...................................................................3-63
A. Removal of the Spinner ...................................................3-63
B. Hub Mounted Spinner Bulkhead Removal ......................3-63
11. Propeller Removal .................................................................3-64
A. Removal of “R” Flange Propellers ...................................3-64