-FS -6
2-2
HOOPING SOCK
2_2 K226
5. Pull entrance of sock to front and locate between
Upper and Lower frame.
6. Take Sock frame out from Sock hooping board.
7. Set Sock frame to Tubular sock frame holder
Insert Sock frame up to the position of stopper
on Holder.
Please confirm that Hold springs of Holder enter
into square holes of Sock frame.
Sock Frame
Hold spring
Summary of Contents for HCR3E Series
Page 1: ...3EVB10 13 HCR3E Industrial Multi head Embroidery Machine INSTRUCTION BOOK Program Ver C 3 04 ...
Page 2: ......
Page 144: ... D2 117 13 6 FRAME CONFIRMATION 20_5 NB01 11 Press Press to return to Drive mode ...
Page 280: ... RA 110 26 3 BUILT IN FONT LIST 26_3 P401 Basic script Diacritic script ...
Page 281: ... RA 111 26 3a BUILT IN FONT LIST 26_3a P401 ...
Page 284: ......
Page 329: ......