Page
66
SmartFOAM
INSTALLATION AND DELIVERY CHECKLIST
After the Hale SmartFOAM system is installed, use the following check list to verify installation and ensure proper system
setup when the apparatus is delivered to the end user.
INSTALLATION
Date
Initials
Checklist item
❑
System properly installed.
(“Start-Up Check List”)
❑
Tank
level sensor function verified. (“System Installer Start-Up”)
❑
Foam pump operation checked.
(“System Installer Start-Up”)
❑
Foam tank and hoses drained of water.
(“System Installer Start-Up”)
❑
Flow sensor function checked and calibrated.
(“User Calibration”)
DELIVERY
Date
Initials
Checklist item
❑
Foam tank filled with user specified foam concentrate. (Complies with Hale
approved concentrate compatibility list.)
❑
Foam pump priming checked.
❑
Water flow sensor calibration verified with Pitot and smooth bore nozzle.
❑
Default simulated water flow value set to end user specification.
❑
Foam preset text and injection rates set to end user specification.
❑
Foam concentrate feedback value verified and calibrated with end user specified
foam.
❑
Proper Hale SmartFOAM system operation demonstrated to end user in accordance
with manual procedures.
❑
End user trained in proper operation of Hale SmartFOAM system in accordance with
manual procedures.
❑
Warranty registration card filled out by end user and mailed to Hale Products.
❑
Two copies of Description, Installation, and Operation manual provided to end user.
Summary of Contents for SmartFOAM 1.7AHP
Page 3: ...Page 2 SmartFOAM NOTES...
Page 14: ...Page 13 SmartFOAM Figure 2 3 3 and 5 0 Foam Pump Installation Envelope Dimensions...
Page 15: ...Page 14 SmartFOAM SYSTEM DIAGRAM Figure 3 Typical Hale SmartFOAM 2 1A and 1 7AHP System...
Page 16: ...Page 15 SmartFOAM Figure 4 SmartFOAM 3 3 5 0 6 5 Single Tank System with In line Strainer...
Page 17: ...Page 16 SmartFOAM Figure 5 SmartFOAM 3 3 5 0 6 5 Single Tank withMSTandIn lineStrainer...
Page 18: ...Page 17 SmartFOAM Figure 6 SmartFOAM 3 3 5 0 6 5 Single Tank withMSTandFSSeriesStrainer...
Page 19: ...Page 18 SmartFOAM Figure 7 SmartFOAM 3 3 5 0 6 5 Dual Tank withMDTIIandIn lineStrainer...
Page 20: ...Page 19 SmartFOAM Figure 8 SmartFOAM 3 3 5 0 6 5 Dual Tank withMDTIIandFSSeriesStrainer...
Page 21: ...Page 20 SmartFOAM Figure 9 SmartFOAM 3 3 5 0 6 5 Dual Tank with ADTandIn lineStrainer...
Page 22: ...Page 21 SmartFOAM Figure 10 SmartFOAM 3 3 5 0 6 5 Dual Tank with ADTandFSSeriesStrainer...
Page 40: ...Page 39 SmartFOAM Figure 18 Typical 4 Inch Check Valve Installation Midship Pump...
Page 51: ...Page 50 SmartFOAM Figure 33 ADT Option Air Hose Connections Part 2...
Page 68: ...Page 67 SmartFOAM NOTES...
Page 80: ...79 Page 79 SmartFOAM NOTES...